Sunday, October 5, 2014

SDLC

Water fall:

Requirements gathering :Gather as much information as possible about the details & specifications of the desired software from the client

Design Stage:Plan the programming language like java , php , .net ; database like oracle , mysql etc which would be suited for the project
Built Stage: actual code
 TEST stage:Test the software to verify that it is built as per the specifications given by the client. 
Maintenance stage.:you may to do some code changes to accommodate enhancements requested by the client.
STLC:
software-test-life-cycle
TEst planning stage: 
  • Preparation of test plan/strategy document for various types of testing
  • Test tool selection 
  • Test effort estimation 
  • Resource planning and determining roles and responsibilities.
  • Training requirement
Envi setup: 
  • Setup test Environment and test data 
  • Perform smoke test on the build
Test closure:
  • Evaluate cycle completion criteria based on Time,Test coverage,Cost, Quality
  • Prepare test metrics ,Test closure report 
  • Document the learning out of the project 

No comments:

Post a Comment